General Zebulon Pike Lock and Dam #11

March 23, 2002

As seen from Eagle Point Park, the construction of this 16-gate lock and dam on the Mississippi River began in February 1934 and was completed in 1937 at a cost of $7,400,000.00.

This page was updated on June 6, 2002.